Rouse Hill Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Pre-Handover (PCI) Inspections in Rouse Hill

The full walk through of your new Rouse Hill home, done while the builder still holds the keys and you still hold the last payment.

  • Safety items listed first
  • Room by room schedule
  • Drone view of roof and gutters
  • External drainage walked
  • Contract and selections checked
  • Before final payment
  • Defect recheck visit option
  • Written up the next day
Request a quoteTell us the address and the stage, and we will come back to you.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

What is included

What is included in a Rouse Hill pre-handover (PCI) inspection

A handover inspection checks the finished home against your contract, plans and selections, the National Construction Code and Housing Provisions, and the NSW Guide to Standards and Tolerances 2017.

Window and balcony safety

  • Bedroom window restrictors upstairs
  • Balustrade height and gaps
  • Balcony overflow provision
  • Glazing to doors and screens

Bathrooms and ensuites

  • Shower screen fixing
  • Sealant to junctions
  • Floor waste falls
  • Tile chips and grout

Brickwork and render

  • Weep holes left open
  • Control joints kept clear
  • Mortar voids and droppings
  • Bricks overhanging the slab

Ground and drainage

  • Weep and damp course clearance
  • Grading away from walls
  • Stormwater pits and pipes
  • Downpipe connections

Roof and flashings

  • Penetration flashings
  • Apron and parapet flashings
  • Gutter brackets and debris

Concrete outside

  • Driveway saw cuts
  • Isolation joint at the slab
  • Surface finish and honeycombing

Doors and windows

  • Latching and striker plates
  • Binding sashes
  • Weather seals
  • Frame damage

Joinery and finishes

  • Cabinet gaps and damage
  • Benchtop and splashback sealing
  • Paint and plaster patches

Roof space

  • Insulation laid evenly
  • Framing visible from the hatch
  • Vents left open to air

32 checkpoints across 9 areas on a standard Rouse Hill pre-handover (PCI) inspection. Anything locked, covered or unsafe to reach on the day is named in the report so it can be checked later.

Sample findings

Sample defects found during our handover inspections in Rouse Hill

Items recorded at practical completion on new homes in Rouse Hill.

Upstairs bedroom window opening wider than 125mm with no restrictor, a fall risk, found during a handover inspection in Rouse Hill
Upstairs bedroom window opening wider than 125mm with no restrictor, a fall risk
Shower screen not secured properly, a safety hazard to fix before handover, found during a handover inspection in Rouse Hill
Shower screen not secured properly, a safety hazard to fix before handover
Front balcony built with no overflow outlet if the drain blocks, found during a handover inspection in Rouse Hill
Front balcony built with no overflow outlet if the drain blocks
Broken stormwater pipe at handover, with a camera check recommended, found during a handover inspection in Rouse Hill
Broken stormwater pipe at handover, with a camera check recommended
Bathroom mixer leaking at handover, needing a plumber before it damages the vanity, found during a handover inspection in Rouse Hill
Bathroom mixer leaking at handover, needing a plumber before it damages the vanity
Driveway control joints never saw cut, so the concrete will crack at random, found during a handover inspection in Rouse Hill
Driveway control joints never saw cut, so the concrete will crack at random
Water escaping under the shower screen onto the bathroom floor, found during a handover inspection in Rouse Hill
Water escaping under the shower screen onto the bathroom floor
Roof penetration flashing badly installed, needing refitting to stay watertight, found during a handover inspection in Rouse Hill
Roof penetration flashing badly installed, needing refitting to stay watertight
Weep holes sitting less than 150mm above the finished ground, found during a handover inspection in Rouse Hill
Weep holes sitting less than 150mm above the finished ground
No pressure flashing holding the roof upturn at the parapet wall, found during a handover inspection in Rouse Hill
No pressure flashing holding the roof upturn at the parapet wall
Our inspectors reviewing a report together
Why Rouse Hill owners choose us

Independent. Licensed. Insured.

  • Two councils, one suburb
  • Old stock and new stock
  • Steel counted, not estimated
  • A report the site supervisor can work through
Guides

Pre-Handover (PCI) Inspections guides for Rouse Hill

All guides →

Book pre-handover (pci) inspections in Rouse Hill

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Rouse Hill: common questions

When should the handover inspection happen?

When the builder tells you the house is at practical completion and before you sign or pay the final claim. Ask for the date as early as you can so there is time to rectify and recheck.

What does a handover inspection cost in Rouse Hill?

It depends on the floor area, the number of storeys and whether a recheck visit is wanted. Request a quote online and the price is shown before you book.

Why are window restrictors such a common item?

Because the rule only bites upstairs, where a bedroom window more than two metres above the ground has to limit its opening to 125mm or be protected another way. Two storey homes are now the norm here, and the restrictor is often missed or fitted to some windows only.

Is a loose shower screen really a safety issue?

Yes. A glass panel that is not properly secured can fail under load. We list it with the safety items rather than among finish defects.

What does a handover inspection leave out?

We do not test electrical, gas, plumbing, solar or air conditioning systems, run appliances, or confirm the occupation certificate. Smoke alarms and switchboards are for a licensed electrician. Areas we cannot reach safely are listed.

Can the builder refuse to fix the items?

They must address genuine defects under the contract and the statutory warranties in the Home Building Act. Put the report to them in writing. If they will not engage, NSW Fair Trading is the next step.

Do you come back to check the repairs?

Yes, a defect recheck can be booked once the builder says the items are done. It confirms each one before you pay the last claim.

CallGet a Free Quote