Deep edge beams on sloping Rouse Hill lots, and the Z bars that hold them in
Why a stepped slab carries extra steel, and what a pre-pour inspection looks for in it.
Roof on, windows in, services roughed in, and the last look inside the walls before the plaster seals them.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
Lock-up is where we find services fighting for space. On Rouse Hill builds we have recorded gas pipes against cold water lines, cables resting on hot water pipes and copper touching steel framing, all of which need separation. The roof gets attention too: split truss members, beams drilled full of holes, torn sarking, broken tile underlaps and an air conditioner drain set to empty onto a flashing.



Annotated findings from Lock-up (pre-plaster) inspections.




1Bored piersBores drilled and cages set, before concrete is ordered
2Slab pre-pourSteel tied and pods placed, the day before the pour
3FrameFrame, trusses and roof bracing up, before sarking and lining
5FixingJoinery, doors and trims in; painter not yet started
6WaterproofingMembrane down and cured, tiles not started
7Pre-handover (PCI)Builder has called practical completion, final claim unpaid
Why a stepped slab carries extra steel, and what a pre-pour inspection looks for in it.

How the bracing system holds a frame against wind, and the parts of it most often missed.

Why gas, water and electrical services must be kept apart, and why lock-up is the last chance to see it.
Instant online pricing, or talk to the booking team on 1300 471 805.
To prevent abrasion, heat transfer and corrosion. The plumbing and wiring rules set minimum gaps, and once the plaster is on nobody can see whether they were kept.
No. We note visible contact between cables and pipes as a separation issue. The wiring itself is for a licensed electrician.
The membrane under the roof covering. It is the second line against wind driven rain and dust, and a tear reduces that protection.
About two hours, depending on size and roof complexity.
Yes. Anything outstanding from the frame report is rechecked and listed if still open.
Wall insulation covers the services. Ask the builder to hold it until after the visit.